Briefing Note: Key Issues and Recommendations on the Draft South African Wholesale Electricity Market (SAWEM) Market Code
Date of Submission: 29 October 2024
Submitted by: Energy Intensive Users Group of Southern Africa (EIUG)
1. Introduction and Context
The Energy Intensive Users Group (EIUG) and its expert advisors have provided comprehensive commentary on the draft Market Code and Market Specification for the South African Wholesale Electricity Market (SAWEM). The submission is constituted by two comprehensive documents that highlight both the opportunities and significant risks in the current proposals, with a focus on ensuring a robust, transparent, and competitive electricity market that supports investment, protects consumers, and enables a just transition.
2. Overarching Themes
2.1. Need for a Structured, Consultative Market Reform Process
- Premature Finalisation of Market Code:
The submission stresses that the Market Code is being developed in the absence of a revised policy White Paper and a comprehensive, consultative market design paper. International best practice (e.g., Australia) shows that successful market reform starts with a clear policy agenda, followed by a conceptual market design, stakeholder engagement, and detailed rules.
Recommendation:- Develop a market design paper and update the White Paper on Energy Policy to reflect current challenges (renewables, coal decommissioning, climate targets).
- Establish a multi-stakeholder working group to guide the process and ensure buy-in from all affected parties.
2.2. Market Design and Structure
- Hybrid Multi-Market Model:
The proposed SAWEM is a hybrid model with a gross power pool (centralized scheduling and dispatch) but also allows for bilateral contracts and self-scheduling for some IPPs.- Gross Pool vs. Net Pool: The rationale for preferring a gross pool over a net pool is not clearly explained. Gross pools offer liquidity and transparency, but net pools (common in the EU) support progressive competition and bilateral trading.
- No Transparent Assessment of Alternatives: There has been no transparent evaluation of the hybrid model against other possible designs.
- Vesting Contracts:
Vesting Contracts (CfDs) between Eskom Generation (Gx) and the Central Purchasing Agency (CPA) are intended to provide price stability and mitigate market power during the transition. However, their design (expiry rate, exclusion of peak generators, reference price, availability payments) is not fully developed and may have unintended consequences for price signals and risk allocation. - Capacity Remuneration Mechanism (CRM):
The need for a CRM or capacity market is recognized, but the design is underdeveloped. Price caps on the System Marginal Price (SMP) may limit
3. Regulatory and Institutional Framework
- Regulatory Capacity and Unbundling:
Much of the expertise in tariff and cost allocation remains concentrated within Eskom, posing challenges for developing new regulatory frameworks. Capacity building for NERSA and other stakeholders is essential. - Tariff Unbundling and Cost Recovery:
The transition to SAWEM will require unbundling of tariffs (generation, transmission, distribution, retail) and the introduction of new charges (SMP, capacity, ancillary services, legacy charges). Transparency and clear allocation of these charges are essential. - Retail Market Code Needed:
The Market Code does not address the retail market or the interface between wholesale and retail. A separate Retail Market Code is needed to clarify the obligations of distributors, retailers, and customers, and to ensure alignment with the competitive market vision.
4. Transition Arrangements and the Role of the CPA
- CPA Responsibilities and Risks:
The CPA will manage Vesting Contracts, REIPPP contracts, ancillary services procurement, capacity expansion planning, and possibly subsidies. This broad mandate may create conflicts of interest and operational complexity.- Funding and Cash Flow Risks: The CPA may face working capital and funding risks due to timing differences in revenue collection and payment obligations. Mechanisms for managing these risks (e.g., government guarantees, levies) must be established.
- Legacy Charges:
The CPA will recover excess costs from early REIPPP contracts via legacy charges on all consumers. The scale, calculation, and reconciliation of these charges require careful assessment and transparency. There is concern that legacy and ancillary service charges may become “dumping grounds” for costs that cannot be allocated elsewhere.
5. Treatment of IPPs, Bilateral Contracts, and Balance Responsibility
- Balance Responsible Parties (BRPs):
IPPs with private PPAs and their customers will become BRPs, subject to new imbalance costs. This may require amendments to existing contracts and could expose parties to higher costs than under current arrangements.- Imbalance Settlement: The draft code requires BRPs to submit day-ahead schedules but does not allow intra-day rescheduling, potentially increasing imbalance exposure.
- Bilateral Contracts and Wheeling: The Market Code does not provide sufficient detail on how physical bilateral contracts and wheeling arrangements will be accommodated, scheduled, and settled in the new market.
- Recommendation: Transitional arrangements and clear rules for balancing, settlements, and information flows are needed to avoid unintended risks and costs for market participants.
6. Price Signals, Investment, and Demand-Side Participation
- Efficient Price Signals:
The market design aims to set efficient prices reflecting marginal costs, incentivizing both supply and demand-side responses. However, price caps and vesting contracts may dampen these signals, necessitating complementary mechanisms (e.g., CRM, reliability options). - Demand-Side Response (DSR):
The role and remuneration of DSR in the balancing market are not fully specified. Efficient DSR requires clear incentives and the ability to participate in reserve and balancing markets. - Ancillary Services and Reserve Pricing:
The proposed approach may overcompensate for reserve capacity by charging consumers the marginal cost rather than the actual cost. The structure and allocation of these charges should be reviewed.
7. Implications for Distributors, Retailers, and Customers
- Unbundling and Licensing:
Distributors will need to unbundle their network and retail functions, obtain separate trading licenses, and manage new credit cover and balancing requirements.- Exposure to Market Prices: As the CPA hedge reduces, distributors and regulated retailers will be increasingly exposed to market prices and volume risk, which may impact their ability to offer stable tariffs to customers.
- Tariff Regulation and Subsidies:
The process for updating tariffs, legacy charges, and subsidies must be clarified and aligned with the new market structure. The role of NERSA in approving and adjusting these charges is critical. - Municipalities and MFMA:
The Municipal Finance Management Act (MFMA) may need to be amended to allow municipalities to participate fully in the market, given the hourly price changes and the need for more dynamic tariff setting.
8. Risks, Gaps, and Open Questions
- Market Design Not Finalised:
The absence of a comprehensive market design paper and policy creates uncertainty and risk for all participants. - Legacy and Ancillary Charges:
Risk of these charges becoming “dumping grounds” for unallocated costs. - Balancing and Settlement:
Lack of clarity on balancing obligations, settlements, and credit cover for non-market participants. - Retail Market and Contestability:
The Market Code does not specify which customers will be eligible to buy from the market, how contestability will be phased in, or how retail tariffs will be regulated. - Wheeling and Bilateral Contracts:
Insufficient detail on how these will be accommodated and settled in the new market. - Non-Payment Risk:
Distributors, especially Eskom Distribution, may face increased non-payment risk as default retailer of last resort.
9. Recommendations
- Develop a Market Design Paper and Update Policy:
- Revise the White Paper on Energy Policy and develop a conceptual market design paper before finalizing the Market Code.
- Establish a Multi-Stakeholder Working Group:
- Ensure inclusive, transparent, and coordinated development of the market framework.
- Build Regulatory Capacity:
- Invest in capacity building for NERSA and other stakeholders to support the transition.
- Clarify and Limit CPA Responsibilities:
- Avoid conflicts of interest and ensure effective governance.
- Enhance Transparency and Methodology for Charges:
- Clearly define, calculate, and communicate legacy, ancillary, and capacity charges.
- Develop a Retail Market Code:
- Address the interface between wholesale and retail, contestability, and customer protection.
- Specify Rules for Bilateral Contracts and Wheeling:
- Ensure clear, fair, and efficient arrangements for all market participants.
- Address Balancing and Settlement Risks:
- Define balancing obligations, credit cover, and settlement processes for all parties.
- Model and Assess Market Impacts:
- Use quantitative modelling to inform decisions on vesting contracts, SMPs, legacy costs, and CRM design.
- Plan for Transition and Implementation:
- Allow for pilots, testing, and phased implementation to manage risks and build confidence.
10. Conclusion
The draft SAWEM Market Code and Specification represent a significant step toward a competitive, efficient, and reliable electricity market in South Africa. However, several areas require further development, clarification, and stakeholder engagement to ensure policy alignment, market efficiency, and fair treatment of all participants—especially energy-intensive users, distributors, and customers. Ongoing dialogue, regulatory capacity building, and robust modelling will be critical to a successful transition.